Apply gable trim to both roof sheeting ends. Fasten at the top and sides as shown at intervals of 24" o.c.
Apply the ridge cap as shown, fastening through the cap and roofing at every rib. If using a formed ridge cap, be sure to align the sheets properly.
Secure the upstanding leg to the wall by fastening it at 24" intervals. Then fasten through the lower leg near the edge of the flashing on every rib.
Apply C-Metal to the end of roof panels and secure by fastening at 24" o.c. Insert Closures and caulk. Install screen (by others). Then apply the vented ridge cap as shown, fastening through the cap and roofing at every rib.
We’re here to help! Simply call 805-238-1783 to discuss your requirements.
PHONE: 805-238-1783
EMAIL: adam.andrade@yahoo.com
ADDRESS: 9155 El Camino Real Atascadero, California
Monday to Friday
7:30 am - 5:00 pm
By appointment only